Sungurlu OSB Pyrolysis Automation Control System Project
AK ENERJİ
-
PROJECT NAME
Sungurlu OSB Pyrolysis Automation Control System Project
-
SECTOR
OIL&GAS
-
DATE OF COMPLETION
2021-2022
-
SCOPE
- SCADA system design including hardware, software, configuration, manufacturing, engineering, programming, testing, documentation, installation, and commissioning for auxiliary facilities.
-
EXECUTION
Melen 1 and 2 Pump Stations, located at the Istanbul Water and Sewerage Administration, are vital for Istanbul, especially during the summer months when the city faces a constant risk of drought.
To ensure the reliable operation of this facility, which provides clean water access to 16 million citizens, it is essential that each component is kept up-to-date and in optimal condition. Therefore, it is necessary for the Melen 1 and 2 pump stations to be monitored and controlled by the most current and advanced systems.
In this project, which we are proud to have completed, the existing control system has been updated and the System 800xA, one of the leading DCS systems in the world, has been commissioned.
Additionally, new observation points have been added to the transmission line, central monitoring of these points has been ensured, and thus, both the security and efficiency of this facility, which meets Istanbul’s fundamental needs, have been enhanced.
REFERENCES