KANGAL ROLLING MILL CONNECTION UNIT PROJECT
İskendurun Demir Çelik
-
PROJECT NAME
Kangal Rolling Mill Connection Unit Project
-
SECTORS
Iron – Steel
-
DATE OF COMPLETION
2021-2022
-
SCOPE
- CPU Upgrade for Kangal Rolling Mill Connection PLC System at İskenderun Iron and Steel Company
- Upgrade of the CPU in the existing PLC panel at Kangal Rolling Mill as specified in the technical specifications.
- Renewal of the PLC panel as per the specifications, transfer of the existing process software to the new system with necessary modifications, software and license updates, provision of operator and engineering stations.
- Design, procurement, disassembly, assembly, testing, and commissioning of the panel, cabling, and cable installation according to the specified requirements.
- The task involves renewing a portion of the existing ABB automation system.
- Re-drafting of the existing PLC circuit diagrams according to the new situation using Eplan software.
- Extraction, upgrade, and necessary modifications of the software from existing PLCs, and transferring and adapting it to the new PLCs.
- Preparation of all HMI and SCADA screen pages for Touch panels and OSs in the ABB PLC Automation System, design and definition of alarms, trends related to the process, and completion of any missing SCADA, alarm, trend, etc., identified during commissioning.
- Establishment of the communication system for the automation network.
-
EXECUTION
The Bursa T2 Tram Line is a tram project consisting of 11 stations and 7 transformer centers, connecting the Bursa Intercity Bus Terminal with Osmangazi City Square.
There was a need for communication infrastructure between a total of 20 locations, including stops, transformer centers, maintenance and repair sites, and Burulaş locations. Since the traffic to be transmitted includes SDH, PDH, and Ethernet traffic, the client’s expectation was for a compact product. Additionally, PoE support was required for CCTV.
The design and engineering of the communication infrastructure needed for cameras, announcements, IP telephony, SCADA, radios, fire alarms, and passenger information systems at these stations and transformer centers were carried out by us. Furthermore, RTU and SCADA systems were installed to enable remote monitoring and control of MV and DC cells, rectifiers, LV distribution panels, and intrusion alarm systems at the transformer centers.
The communication infrastructure was established using 48-core fiber optic cables pulled from the east and west of the line and ABB XMC25 industrial communication devices, providing a 10 Gb/s main ring.