Melen 3 Pump Station Automation

İSKİ

  • PROJECT NAME

    MELEN 3 Pump Station Automation Project

  • SECTOR

    Water Supply Lines

  • DATE OF COMPLETION

    2023

  • SCOPE
    • Design and installation of automation panels for Melen 3 Pump Station
    • Signal testing of the DCS system for Melen 3
    • Pump Station and project documentation (as-built)
    • Integration and commissioning of new control software into the existing system
  • EXECUTION

    After the design, manufacturing, and installation of automation panels for the Melen 3 Pump Station were completed, the software work for the automation system began.

    The project included the monitoring and control of medium voltage pump control panels on-site, as well as the monitoring of medium voltage pump starters and compensation panels via MODBUS RTU.

    Following the commissioning of the Melen 3 Pump Station, the project was completed with the integration of the facility’s data into the central network of Istanbul Water and Sewerage Administration.