Skip to main content

Bigadic Solar Power Plant

MUNICIPALITY OF BIGADIC

  • PROJECT NAME

    Bigadiç Solar Power Plant Project

  • SECTORS

    ENERGY

  • DATE OF COMPLETION

    2019-2020

  • SCOPE
    • Construction of a 1.17 MW Solar Power Plant on Parcel Number 50, Block 137, Okçular Neighborhood, Bigadiç Municipality
    • The entire process, from the installation of solar panels to the connection to the high-voltage line
  • EXECUTION

    It is an automation application developed with the ABB 800xA Platform and supports the S800 IO family.

    – SCADA software was developed for the control of the automation system.
    – The supply, installation, and documentation of the DCS, MCC, and Flow Computer panels were included in the entire system.


Contact

  • Address
    Küçük Çamlıca Mah. Ümit Sok. No:10 Kat:1 Üsküdar İstanbul